1,136 OZEV-approved companies  ·  Get free quotes today →
Home Directory 365 Electrical Solutions
3E

365 Electrical Solutions

Carmarthen, SA33 4LT
OZEV Approved Commercial
★★★★½
4.5/5 rating
0
reviews
£500
WCS grant
At a Glance
Rating★★★★½ 4.5
Reviews0 verified
LocationCarmarthen
WCS GrantsUp to £500
Response<24h
Accreditations
OZEV Approved
NICEIC Approved
Usually responds within 24 hours
Service area: Carmarthen & surroundsView on map →

About 365 Electrical Solutions

365 Electrical Solutions is a certified electrical contractor offering EV charger installation and electrical services in Carmarthen.

Electrician

Installation Types

Commercial / Workplace

Workplace Charging Scheme (WCS), fleet charging, hotel & destination charging. All OZEV-approved for grant applications.

Residential

Home chargers, flat & apartment solutions. Eligible for OZEV Renter & Flat Owner Grant up to £500.

Specialist

Solar-integrated EV charging (Zappi-compatible), load balancing for older fuse boards, DNO applications.

Government Grants & Compliance

£500
per socket via WCS
  • 365 Electrical Solutions is OZEV-approved and manages your WCS application, deducting the grant at invoice
  • Workplace Charging Scheme: up to £500/socket, max 40 sockets per site
  • Part S Building Regs compliant — DNO notification handled
  • IET Wiring Regulations 18th Edition compliant

Charger Brands Installed

WBX
Wallbox
OHM
Ohme
EO
EO
ZAP
Zappi

Recent Installs Gallery

Gallery images are illustrative. Contact 365 Electrical Solutions to view their portfolio of completed installations.

Frequently Asked Questions

Does 365 Electrical Solutions cover areas outside Carmarthen?
Yes — 365 Electrical Solutions typically covers a wide service area around Carmarthen. Contact them directly to confirm coverage for your specific location. Most of our OZEV-approved installers cover a radius of 20–50 miles from their base.
How long does a commercial EV charger installation take?
Most commercial installations take 1–2 days for a standard workplace installation. Larger fleet depot or multi-bay car park installations may take 3–5 days. A site survey is always conducted first to confirm timescales.
Can you handle the WCS grant application for us?
Yes — as an OZEV-approved installer, 365 Electrical Solutions manages the entire Workplace Charging Scheme application process. The grant of up to £500 per socket is deducted directly from your invoice, so there is no upfront cost to you.
What happens with the DNO notification?
Your installer will submit the Distribution Network Operator (DNO) notification on your behalf. This is required for installations over 3.68kW and is handled as part of the standard installation process.
Is the installation Part P / Part S compliant?
All installations carried out by OZEV-approved installers comply with Part P (Electrical Safety) and Part S (Electric Vehicle Charging) Building Regulations, as well as IET Wiring Regulations (18th Edition).

Coverage Area

CARMARTH

Ready to get a quote from 365 Electrical Solutions?

Fill in the form above or browse more installers in Carmarthen and nearby areas.

← Back to all installers
Get a Free Quote from 365 Electrical Solutions
No obligation · OZEV approved · WCS grants available
🔒 No obligation · Free service
⚡ Check Your Grant Eligibility
Do you have off-street parking?
Are you a tenant or owner?
£500/socket

via WCS Grant

Up to 40 sockets per site. 365 Electrical Solutions manages the application.

Read WCS Guide →
£500

Renter & Flat Owner Grant

Available to EV drivers without a driveway. Ask 365 Electrical Solutions for details.

You may still be eligible

Contact 365 Electrical Solutions to discuss on-street or communal charging options.

Contact Details

5 Corvus Terrace, St Clears, Carmarthen SA33 4LT