1,136 OZEV-approved companies  ·  Get free quotes today →
Home Directory Aird Walker & Ralston
AW

Aird Walker & Ralston

Kilmarnock, KA1 3JP
OZEV Approved Commercial Installation
★★★★★
5.0/5 rating
2
reviews
£500
WCS grant
At a Glance
Rating★★★★★ 5.0
Reviews2 verified
LocationKilmarnock
WCS GrantsUp to £500
Response<8h
Accreditations
OZEV Approved
NICEIC Approved
Usually responds within 8 hours
Service area: Kilmarnock & surroundsView on map →

About Aird Walker & Ralston

Aird Walker & Ralston is a certified electrical contractor offering EV charger installation and electrical services in Kilmarnock.

ElectricianElectrical InstallationElectrical Engineering

Installation Types

Commercial / Workplace

Workplace Charging Scheme (WCS), fleet charging, hotel & destination charging. All OZEV-approved for grant applications.

Residential

Home chargers, flat & apartment solutions. Eligible for OZEV Renter & Flat Owner Grant up to £500.

Specialist

Solar-integrated EV charging (Zappi-compatible), load balancing for older fuse boards, DNO applications.

Government Grants & Compliance

£500
per socket via WCS
  • Aird Walker & Ralston is OZEV-approved and manages your WCS application, deducting the grant at invoice
  • Workplace Charging Scheme: up to £500/socket, max 40 sockets per site
  • Part S Building Regs compliant — DNO notification handled
  • IET Wiring Regulations 18th Edition compliant

Charger Brands Installed

EAS
Easee
TES
Tesla
RLC
Rolec
WBX
Wallbox

Recent Installs Gallery

Gallery images are illustrative. Contact Aird Walker & Ralston to view their portfolio of completed installations.

Frequently Asked Questions

Does Aird Walker & Ralston cover areas outside Kilmarnock?
Yes — Aird Walker & Ralston typically covers a wide service area around Kilmarnock. Contact them directly to confirm coverage for your specific location. Most of our OZEV-approved installers cover a radius of 20–50 miles from their base.
How long does a commercial EV charger installation take?
Most commercial installations take 1–2 days for a standard workplace installation. Larger fleet depot or multi-bay car park installations may take 3–5 days. A site survey is always conducted first to confirm timescales.
Can you handle the WCS grant application for us?
Yes — as an OZEV-approved installer, Aird Walker & Ralston manages the entire Workplace Charging Scheme application process. The grant of up to £500 per socket is deducted directly from your invoice, so there is no upfront cost to you.
What happens with the DNO notification?
Your installer will submit the Distribution Network Operator (DNO) notification on your behalf. This is required for installations over 3.68kW and is handled as part of the standard installation process.
Is the installation Part P / Part S compliant?
All installations carried out by OZEV-approved installers comply with Part P (Electrical Safety) and Part S (Electric Vehicle Charging) Building Regulations, as well as IET Wiring Regulations (18th Edition).

Coverage Area

KILMARNO

Ready to get a quote from Aird Walker & Ralston?

Fill in the form above or browse more installers in Kilmarnock and nearby areas.

← Back to all installers
Get a Free Quote from Aird Walker & Ralston
No obligation · OZEV approved · WCS grants available
🔒 No obligation · Free service
⚡ Check Your Grant Eligibility
Do you have off-street parking?
Are you a tenant or owner?
£500/socket

via WCS Grant

Up to 40 sockets per site. Aird Walker & Ralston manages the application.

Read WCS Guide →
£500

Renter & Flat Owner Grant

Available to EV drivers without a driveway. Ask Aird Walker & Ralston for details.

You may still be eligible

Contact Aird Walker & Ralston to discuss on-street or communal charging options.

Contact Details