1,136 OZEV-approved companies  ·  Get free quotes today →
Home Directory Heath Electrical Services
HE

Heath Electrical Services (MK1 1SF)

Milton Keynes, MK1 1SF
OZEV Approved Commercial EV Specialist
★★★★½
4.8/5 rating
771
reviews
£500
WCS grant
At a Glance
Rating★★★★½ 4.8
Reviews771 verified
LocationMilton Keynes
WCS GrantsUp to £500
Response<8h
Accreditations
OZEV Approved
Usually responds within 8 hours
Service area: Milton Keynes & surroundsView on map →

About Heath Electrical Services

Heath Electrical Services is a certified electrical contractor offering EV charger installation and electrical services in Milton Keynes.

EV ChargingElectricianElectrical InstallationElectrical EngineeringLighting

Installation Types

Commercial / Workplace

Workplace Charging Scheme (WCS), fleet charging, hotel & destination charging. All OZEV-approved for grant applications.

Residential

Home chargers, flat & apartment solutions. Eligible for OZEV Renter & Flat Owner Grant up to £500.

Specialist

Solar-integrated EV charging (Zappi-compatible), load balancing for older fuse boards, DNO applications.

Government Grants & Compliance

£500
per socket via WCS
  • Heath Electrical Services is OZEV-approved and manages your WCS application, deducting the grant at invoice
  • Workplace Charging Scheme: up to £500/socket, max 40 sockets per site
  • Part S Building Regs compliant — DNO notification handled
  • IET Wiring Regulations 18th Edition compliant

Charger Brands Installed

EAS
Easee
TES
Tesla
RLC
Rolec
WBX
Wallbox

Recent Installs Gallery

Gallery images are illustrative. Contact Heath Electrical Services to view their portfolio of completed installations.

Frequently Asked Questions

Does Heath Electrical Services cover areas outside Milton Keynes?
Yes — Heath Electrical Services typically covers a wide service area around Milton Keynes. Contact them directly to confirm coverage for your specific location. Most of our OZEV-approved installers cover a radius of 20–50 miles from their base.
How long does a commercial EV charger installation take?
Most commercial installations take 1–2 days for a standard workplace installation. Larger fleet depot or multi-bay car park installations may take 3–5 days. A site survey is always conducted first to confirm timescales.
Can you handle the WCS grant application for us?
Yes — as an OZEV-approved installer, Heath Electrical Services manages the entire Workplace Charging Scheme application process. The grant of up to £500 per socket is deducted directly from your invoice, so there is no upfront cost to you.
What happens with the DNO notification?
Your installer will submit the Distribution Network Operator (DNO) notification on your behalf. This is required for installations over 3.68kW and is handled as part of the standard installation process.
Is the installation Part P / Part S compliant?
All installations carried out by OZEV-approved installers comply with Part P (Electrical Safety) and Part S (Electric Vehicle Charging) Building Regulations, as well as IET Wiring Regulations (18th Edition).

Coverage Area

MILTON K

Ready to get a quote from Heath Electrical Services?

Fill in the form above or browse more installers in Milton Keynes and nearby areas.

← Back to all installers
Get a Free Quote from Heath Electrical Services
No obligation · OZEV approved · WCS grants available
🔒 No obligation · Free service
⚡ Check Your Grant Eligibility
Do you have off-street parking?
Are you a tenant or owner?
£500/socket

via WCS Grant

Up to 40 sockets per site. Heath Electrical Services manages the application.

Read WCS Guide →
£500

Renter & Flat Owner Grant

Available to EV drivers without a driveway. Ask Heath Electrical Services for details.

You may still be eligible

Contact Heath Electrical Services to discuss on-street or communal charging options.

Contact Details