1,136 OZEV-approved companies  ·  Get free quotes today →
Home Directory Hicks Electrical Solutions Ltd
HE

Hicks Electrical Solutions Ltd

Gloucester, GL4 5DN
OZEV Approved Commercial
★★★★★
5.0/5 rating
14
reviews
£500
WCS grant
At a Glance
Rating★★★★★ 5.0
Reviews14 verified
LocationGloucester
WCS GrantsUp to £500
Response<2h
Accreditations
OZEV Approved
NICEIC Approved
NAPIT Registered
City & Guilds 2921
Usually responds within 2 hours
Service area: Gloucester & surroundsView on map →

About Hicks Electrical Solutions Ltd

Hicks Electrical Solutions Ltd is a certified electrical contractor offering EV charger installation and electrical services in Gloucester.

Electrician

Installation Types

Commercial / Workplace

Workplace Charging Scheme (WCS), fleet charging, hotel & destination charging. All OZEV-approved for grant applications.

Residential

Home chargers, flat & apartment solutions. Eligible for OZEV Renter & Flat Owner Grant up to £500.

Specialist

Solar-integrated EV charging (Zappi-compatible), load balancing for older fuse boards, DNO applications.

Government Grants & Compliance

£500
per socket via WCS
  • Hicks Electrical Solutions Ltd is OZEV-approved and manages your WCS application, deducting the grant at invoice
  • Workplace Charging Scheme: up to £500/socket, max 40 sockets per site
  • Part S Building Regs compliant — DNO notification handled
  • IET Wiring Regulations 18th Edition compliant

Charger Brands Installed

ZAP
Zappi
HYP
Hypervolt
ALF
Alfen
POD
Pod Point

Recent Installs Gallery

Gallery images are illustrative. Contact Hicks Electrical Solutions Ltd to view their portfolio of completed installations.

Frequently Asked Questions

Does Hicks Electrical Solutions Ltd cover areas outside Gloucester?
Yes — Hicks Electrical Solutions Ltd typically covers a wide service area around Gloucester. Contact them directly to confirm coverage for your specific location. Most of our OZEV-approved installers cover a radius of 20–50 miles from their base.
How long does a commercial EV charger installation take?
Most commercial installations take 1–2 days for a standard workplace installation. Larger fleet depot or multi-bay car park installations may take 3–5 days. A site survey is always conducted first to confirm timescales.
Can you handle the WCS grant application for us?
Yes — as an OZEV-approved installer, Hicks Electrical Solutions Ltd manages the entire Workplace Charging Scheme application process. The grant of up to £500 per socket is deducted directly from your invoice, so there is no upfront cost to you.
What happens with the DNO notification?
Your installer will submit the Distribution Network Operator (DNO) notification on your behalf. This is required for installations over 3.68kW and is handled as part of the standard installation process.
Is the installation Part P / Part S compliant?
All installations carried out by OZEV-approved installers comply with Part P (Electrical Safety) and Part S (Electric Vehicle Charging) Building Regulations, as well as IET Wiring Regulations (18th Edition).

Coverage Area

GLOUCEST

Ready to get a quote from Hicks Electrical Solutions Ltd?

Fill in the form above or browse more installers in Gloucester and nearby areas.

← Back to all installers
Get a Free Quote from Hicks Electrical Solutions Ltd
No obligation · OZEV approved · WCS grants available
🔒 No obligation · Free service
⚡ Check Your Grant Eligibility
Do you have off-street parking?
Are you a tenant or owner?
£500/socket

via WCS Grant

Up to 40 sockets per site. Hicks Electrical Solutions Ltd manages the application.

Read WCS Guide →
£500

Renter & Flat Owner Grant

Available to EV drivers without a driveway. Ask Hicks Electrical Solutions Ltd for details.

You may still be eligible

Contact Hicks Electrical Solutions Ltd to discuss on-street or communal charging options.

Contact Details