1,136 OZEV-approved companies  ·  Get free quotes today →
Home Directory Mega Electrical NW Ltd
ME

Mega Electrical NW Ltd

Mold, CH7 5JH
OZEV Approved Commercial
★★½
2.6/5 rating
5
reviews
£500
WCS grant
At a Glance
Rating★★½ 2.6
Reviews5 verified
LocationMold
WCS GrantsUp to £500
Response<4h
Accreditations
OZEV Approved
Usually responds within 4 hours
Service area: Mold & surroundsView on map →

About Mega Electrical NW Ltd

Mega Electrical NW Ltd is a certified electrical contractor offering EV charger installation and electrical services in Mold.

Electrician

Installation Types

Commercial / Workplace

Workplace Charging Scheme (WCS), fleet charging, hotel & destination charging. All OZEV-approved for grant applications.

Residential

Home chargers, flat & apartment solutions. Eligible for OZEV Renter & Flat Owner Grant up to £500.

Specialist

Solar-integrated EV charging (Zappi-compatible), load balancing for older fuse boards, DNO applications.

Government Grants & Compliance

£500
per socket via WCS
  • Mega Electrical NW Ltd is OZEV-approved and manages your WCS application, deducting the grant at invoice
  • Workplace Charging Scheme: up to £500/socket, max 40 sockets per site
  • Part S Building Regs compliant — DNO notification handled
  • IET Wiring Regulations 18th Edition compliant

Charger Brands Installed

POD
Pod Point
EAS
Easee
TES
Tesla
RLC
Rolec

Recent Installs Gallery

Gallery images are illustrative. Contact Mega Electrical NW Ltd to view their portfolio of completed installations.

Frequently Asked Questions

Does Mega Electrical NW Ltd cover areas outside Mold?
Yes — Mega Electrical NW Ltd typically covers a wide service area around Mold. Contact them directly to confirm coverage for your specific location. Most of our OZEV-approved installers cover a radius of 20–50 miles from their base.
How long does a commercial EV charger installation take?
Most commercial installations take 1–2 days for a standard workplace installation. Larger fleet depot or multi-bay car park installations may take 3–5 days. A site survey is always conducted first to confirm timescales.
Can you handle the WCS grant application for us?
Yes — as an OZEV-approved installer, Mega Electrical NW Ltd manages the entire Workplace Charging Scheme application process. The grant of up to £500 per socket is deducted directly from your invoice, so there is no upfront cost to you.
What happens with the DNO notification?
Your installer will submit the Distribution Network Operator (DNO) notification on your behalf. This is required for installations over 3.68kW and is handled as part of the standard installation process.
Is the installation Part P / Part S compliant?
All installations carried out by OZEV-approved installers comply with Part P (Electrical Safety) and Part S (Electric Vehicle Charging) Building Regulations, as well as IET Wiring Regulations (18th Edition).

Coverage Area

MOLD AND

Ready to get a quote from Mega Electrical NW Ltd?

Fill in the form above or browse more installers in Mold and nearby areas.

← Back to all installers
Get a Free Quote from Mega Electrical NW Ltd
No obligation · OZEV approved · WCS grants available
🔒 No obligation · Free service
⚡ Check Your Grant Eligibility
Do you have off-street parking?
Are you a tenant or owner?
£500/socket

via WCS Grant

Up to 40 sockets per site. Mega Electrical NW Ltd manages the application.

Read WCS Guide →
£500

Renter & Flat Owner Grant

Available to EV drivers without a driveway. Ask Mega Electrical NW Ltd for details.

You may still be eligible

Contact Mega Electrical NW Ltd to discuss on-street or communal charging options.

Contact Details

Unit 6, Antelope Industrial Estate, Rhydymwyn, Mold CH7 5JH