1,136 OZEV-approved companies  ·  Get free quotes today →
Home Directory SMC Electrical Essex limited
SE

SMC Electrical Essex limited

Clacton-on-Sea, CO15 4XD
OZEV Approved Commercial
★★★★½
4.9/5 rating
30
reviews
£500
WCS grant
At a Glance
Rating★★★★½ 4.9
Reviews30 verified
LocationClacton-on-Sea
WCS GrantsUp to £500
Response<4h
Accreditations
OZEV Approved
NICEIC Approved
Usually responds within 4 hours
Service area: Clacton-on-Sea & surroundsView on map →

About SMC Electrical Essex limited

SMC Electrical Essex limited is a certified electrical contractor offering EV charger installation and electrical services in Clacton-on-Sea.

Electrician

Installation Types

Commercial / Workplace

Workplace Charging Scheme (WCS), fleet charging, hotel & destination charging. All OZEV-approved for grant applications.

Residential

Home chargers, flat & apartment solutions. Eligible for OZEV Renter & Flat Owner Grant up to £500.

Specialist

Solar-integrated EV charging (Zappi-compatible), load balancing for older fuse boards, DNO applications.

Government Grants & Compliance

£500
per socket via WCS
  • SMC Electrical Essex limited is OZEV-approved and manages your WCS application, deducting the grant at invoice
  • Workplace Charging Scheme: up to £500/socket, max 40 sockets per site
  • Part S Building Regs compliant — DNO notification handled
  • IET Wiring Regulations 18th Edition compliant

Charger Brands Installed

HYP
Hypervolt
ALF
Alfen
POD
Pod Point
EAS
Easee

Recent Installs Gallery

Gallery images are illustrative. Contact SMC Electrical Essex limited to view their portfolio of completed installations.

Frequently Asked Questions

Does SMC Electrical Essex limited cover areas outside Clacton-on-Sea?
Yes — SMC Electrical Essex limited typically covers a wide service area around Clacton-on-Sea. Contact them directly to confirm coverage for your specific location. Most of our OZEV-approved installers cover a radius of 20–50 miles from their base.
How long does a commercial EV charger installation take?
Most commercial installations take 1–2 days for a standard workplace installation. Larger fleet depot or multi-bay car park installations may take 3–5 days. A site survey is always conducted first to confirm timescales.
Can you handle the WCS grant application for us?
Yes — as an OZEV-approved installer, SMC Electrical Essex limited manages the entire Workplace Charging Scheme application process. The grant of up to £500 per socket is deducted directly from your invoice, so there is no upfront cost to you.
What happens with the DNO notification?
Your installer will submit the Distribution Network Operator (DNO) notification on your behalf. This is required for installations over 3.68kW and is handled as part of the standard installation process.
Is the installation Part P / Part S compliant?
All installations carried out by OZEV-approved installers comply with Part P (Electrical Safety) and Part S (Electric Vehicle Charging) Building Regulations, as well as IET Wiring Regulations (18th Edition).

Coverage Area

CLACTON-

Ready to get a quote from SMC Electrical Essex limited?

Fill in the form above or browse more installers in Clacton-on-Sea and nearby areas.

← Back to all installers
Get a Free Quote from SMC Electrical Essex limited
No obligation · OZEV approved · WCS grants available
🔒 No obligation · Free service
⚡ Check Your Grant Eligibility
Do you have off-street parking?
Are you a tenant or owner?
£500/socket

via WCS Grant

Up to 40 sockets per site. SMC Electrical Essex limited manages the application.

Read WCS Guide →
£500

Renter & Flat Owner Grant

Available to EV drivers without a driveway. Ask SMC Electrical Essex limited for details.

You may still be eligible

Contact SMC Electrical Essex limited to discuss on-street or communal charging options.

Contact Details